Scope of Works
- Full underground services including all decline and lateral development
- Production including long hole open stoping, blasting, bogging and backfilling of stopes with CRF
- Airleg work including escapeways and slots
- Development of an additional portal to breakthrough into existing decline development
- Dewatering strategies to control and manage large volumes of water underground, including installation of the emergency pumping system to manage up to 90L/s
- Development and construction of the new Primary Exhaust system
- Shotcrete and construction of ventilation walls in house with InCycle Shotcrete
- A completely digital mine
- Peak work force of 45 personnel
- Predominately new equipment fleet including new Sandvik Jumbo DD421, CAT 2900, CAT 1700K. Longhole drilling DL421