bringing certainty to
underground mining

Home 2018-07-12T23:42:18+00:00

Learn how RUC can provide certainty to your next underground project

CONTACT

FACT

We offer a complete turnkey underground hard rock solution with all expertise and capability under the one roof

Read more

SAFETY
FIRST

We’re proud to say that since 2012 we’ve averaged at a minimum, half the industry average lost time injury rate.

PROVEN TRACK
RECORD

In 26 years we’ve never failed to complete a project. And we’ve never litigated or been prosecuted.

WORLD
LEADERS

We pioneered RVDS technology, which in simple terms means we can drill to a 0.01% accuracy.

MORE MECHANISED METRES

Over the last 2 years we’ve installed over 2 million metres of permanent cable bolts on a single job – that’s 100,000m per month.

LOOK NO
FURTHER

Mechanised mining, Shaft sinking, Large excavations, Underground construction, Specialist ground support, Boxhole boring, Raise drilling.

BREAKING NEW GROUND

Like the whole of mine, whole of fleet real-time tracking system we’re the first underground mining contractor in the world to implement, step changing safety and productivity.

LinkedIn Updates

    LinkedIn Company Updates

  • 26 Days Agoview on linkedin

    RUC Cementation Mining Contractors Pty Ltd

    Strong Start for Mt Morgans Dacian Gold Limited is off to a good start at the Mt Morgans gold mine near Laverton, with the new operation meeting guidance in its first quarter. "This should be of much comfort to investors because it reflects the professionalism of our employees and mining contractors, RUC and Mcmahon..." Full article here: https://lnkd.in/gwMB2bE

  • 30 Days Agoview on linkedin

    RUC Cementation Mining Contractors Pty Ltd

    Recently RUC commissioned it’s purpose designed and built chute pass concrete lining set up at it’s Freeport operations. Designed by Perth based @WILSHAW Engineering with this set up we are achieving 1.5m lined per shift. RUC is contracted to place concrete, steel and shotcrete lining in the chute ore passes and ore passes from the extraction level for the Grasberg Block Cave mine. Seen below is the crew with our President Director on a recent visit.

FACT!

We’ve never failed to complete a project in 26 years

Read more
VIEW ALL CAPABILITIES

FACT!

We’re the first mining contractor in the world to implement whole-of-mine, whole-of-fleet real-time tracking for improved safety and productivity

Read more
VIEW ALL CAPABILITIES