Our Projects

Status: CURRENT

Freeport Cable Bolts

Scope of Works

Installing on average over 130,000m of cables per month across 19 rigs. The total metres installed would be well over 4M. Over 85% of our operators are internally trained national operators.

Project Highlights

  • Current monthly average per rig is 110m/rig shift – 157% above target
  • 92,000m of drilled and installed cable bolts each month in 2017
  • Over 4,000,000 cable bolt metres installed to date
  • Cable bolting fleet under operation by RUCC is now 19 rigs.
Client:PT Freeport Mining Indonesia
Location:West Papua
Contract Duration:3 years
Safety Statistics:0.0 LTIFR

enquiry form

Nick Maguire

Manager Mechanised Mining and Raise Boring

Since 1996, Nick’s career to date has predominantly involved underground metalliferous mining.
His experience gained during this time has been from the ground up, having spent years working underground at the ‘coal face’ through to statutory and senior management positions on site and at corporate head offices. This has given Nick an in depth knowledge of all aspects associated with underground mining.

Tracey Chan

Finance Controller and Company Secretary

Tracey is a CPA qualified Accountant with 16 years’ experience working in various industries, including telecommunications, engineering and construction, professional services and the property sector. She started her career in Perth with Gascoine Group and VDM Engineering and Construction, before moving to London to work for City of London Telecom. Tracey joined RUC in 2014 and manages the day-to-day finance function, supporting internal and external business stakeholders, Project Managers and The Board of Directors.

Contact Us