Turnkey Underground Operations / Underground Construction / Shaft Sinking

Freeport GBC Service
Shaft

Freeport GBC Service Shaft

STATUS: COMPLETE

Scope of Works

Shaft excavation by raise drill strip and line method. The GBC Service Shaft is an 8.5 meter diameter internal, circular, concrete-lined, vertical shaft, fitted with a large double-deck service cage running on tubular steel guides supported by standard buntons on 6.0-meter vertical spacing. The shaft is 353 meters in length, extending from the floor of the headgear room to the shaft bottom. There is a single conveyance in the shaft, running in cage-and-counterweight configuration, a manway, and pipe, electrical, and communications utilities on brackets. The Project included:

  • Excavation, construction, and furnishing of the Grasberg Block Cave (GBC) Service Shaft, including four stations
  • Installation of the GBC Service Shaft permanent hoisting system, (2,500 hp Modified Blair) and construction of the associated shaft stations and related facilities
  • Mobilisation, setup, teardown and demobilisation of the Contractor’s temporary plant forsinking the shaft.
  • HV & LV power supply, shaft control cabling, communication cabling including fibre optic, sensors, video, instrumentation wiring, installation of permanent conveyances, ropes safety devices and fire water services
  • Wet and dry commissioning of the entire permanent facility and handover to PTFI
  • PT Freeport | Grazberg Block Cave
  • 0.0 LTIFR, (1.2MMhrs)

 

2019-05-23T07:23:47+00:00

Notice: ob_end_flush(): failed to send buffer of zlib output compression (0) in /home/ruccom/public_html/wp-includes/functions.php on line 4339

Notice: ob_end_flush(): failed to send buffer of zlib output compression (0) in /home/ruccom/public_html/wp-content/plugins/really-simple-ssl/class-mixed-content-fixer.php on line 111