FREEPORT CABLE BOLTING
STATUS: CURRENT
Client: PT Freeport Mining Indonesia
Location: West Papua
Contract Duration: 3 years
Safety Statistics: 0.0 LTIFR
Scope of Works
Installing on average over 130,000m of cables per month across 19 rigs. The total metres installed would be well over 4M. Over 85% of our operators are internally trained national operators.
Project Highlights
-
Current monthly average per rig is 110m/rig shift – 157% above target
-
92,000m of drilled and installed cable bolts each month in 2017
-
Over 4,000,000 cable bolt metres installed to date
-
Cable bolting fleet under operation by RUCC is now 19 rigs.