Scope of Works

Installing on average over 130,000m of cables per month across 19 rigs. The total metres installed would be well over 4M. Over 85% of our operators are internally trained national operators.

Project Highlights

  • Current monthly average per rig is 110m/rig shift – 157% above target

  • 92,000m of drilled and installed cable bolts each month in 2017

  • Over 4,000,000 cable bolt metres installed to date

  • Cable bolting fleet under operation by RUCC is now 19 rigs.