EDNA MAY UNDERGROUND MINING OPERATIONS
STATUS: CURRENT
Client: Ramelius Resources
Location: 330km East of Perth, WA
Contract Duration: 24 Months
Safety Statistics: 0.0 LTIFR
Scope of Works
-
Full underground services including all decline and lateral development
-
Production including long hole open stoping, blasting, bogging and backfilling of stopes with CRF
-
Airleg work including escapeways and slots
-
Development of an additional portal to breakthrough into existing decline development
-
Dewatering strategies to control and manage large volumes of water underground, including installation of the emergency pumping system to manage up to 90L/s
-
Development and construction of the new Primary Exhaust system
-
Shotcrete and construction of ventilation walls in house with InCycle Shotcrete
-
A completely digital mine
-
Peak work force of 45 personnel
-
Predominately new equipment fleet including new Sandvik Jumbo DD421, CAT 2900, CAT 1700K. Longhole drilling DL421